I have a need to prompt the user to close safari before deploying an update to flash. I have created package for the adobe flash dmg and a Policy-supported push method with the following settings under feed back and timing:
Allow the user to delay running the package
Prompt the user before downloading the package
Prompt the user before running the package
All other check boxes are uncheck on that tab.
Under the Logged off user behavior -
Continue installation is set
Deferral limits
Amount of time user can defer the package 1 hour
User deferal is limited
Number of tmes user can delay: 3
User behavior and timeout options is setup to run the package to after 5 minutes
Am I even in the ballpark on this?