I have eight reports that are scheduled to run once a day at different times. For some reason, the reports have started to run every two minutes, emailing the results. Additionally, the list of receipients have changed.
I've not touched the Schedule Manager for months so am wondering why I'm getting so much trouble.
thanks in advance.
Luke