Send reminder if 1 hour before end

$
0
0

Within our change process our Change Manager would like a reminder email to be sent out to the Change Owner 1 hour prior to his outage window ending.

 

We have an attribute that is called "RequiredEnd" this is the end of the outage window for a change and as such the RFC should be marked as a success or failure so that actions can be taken if required.

 

He would like us to send the mail based on current time being 1 hour before RequiredEnd. 

 

I haven't done very much on calculations and am quite stuck as to where to go with this.  Is anyone able to help?